Introduction to Practical Nondestructive Examination Using ASME Section V
Online Course with e-Instructor Support
Course Description
This course is instructionally designed for inspectors, engineers, and other personnel who want to learn more about the "more common" nondestructive testing methods and requirements in ASME Section V (see Course Outline for details).
Online lessons are available for six months from the date of registration.
Learning Outcomes [+]
Participants who successfully complete this course will be able to:
- identify and apply ASME Section V standard terminology;
- recall the general procedure requirements for nondestructive testing;
- describe the radiographic examination technique and reporting requirements;
- describe the liquid penetrant examination technique and reporting requirements;
- describe the magnetic particle examination technique and reporting requirements;
- recall the significance of using the manual ultrasonic pulse-echo contact method.
Who Should Attend
This e-learning course is designed for inspectors, QA/QC personnel, engineers, tradespeople, and others working for plant owners, pressure equipment manufactures and repair organizations, engineering procurement and construction companies in oil and gas industries (oilfield, upgraders, refineries, etc.), chemical plants, petroleum refining, petrochemical plants, power plants, pulp and paper plants, fertilizer plants, and others.
Course Outline [+]
The following topics are covered in this course:
Introduction to Practical Nondestructive Testing Using ASME Section V
- introduction to standard terminology based on ASME Section V
Procedure Requirements
- personnel
- calibration
- examinations and inspections
- identifying and classifying NDE indications
- evaluation
- records and documentation
Radiographic Examination - Article 2
- procedure requirements
- surface preparation
- weld surface preparation, ripples and reinforcement
- backscatter radiation, excessive backscatter
- system of identification
- contract, component, weld or weld seam, date
- monitoring density limitations of radiographs
- radiographic film, intensifying screens
- image quality indicator (IQI) design
- source size calibration
- densitometer and step wedge comparison film calibration
- radiographic technique, geometric unsharpness
- location markers
- IQI
- selection of wire-type or hole-type
- placement of IQIs with respect to welds
- sensitivity resolution sensitivity per weld thickness
- single-wall and double-wall techniques for materials and welds
- quality of radiographs
- documentation and review
Liquid Penetrant - Article 6
- general
- written procedure requirements
- control of contaminants
- surface preparation - removal of welding flux, welding spatter, paint, other contaminants
- techniques for standard and nonstandard temperatures
- technique restrictions
- calibration
- penetrant application, penetration (dwell) time, excess penetrant removal
- developing
- interpretation
- evaluation, recording of indications
- examination records
Magnetic Particle Examination - Article 7
- general, MT of surface weld cracks and orientation
- written procedure requirements
- examination medium
- surface conditioning - as-welded, as-rolled, as-cast, as-forged
- prod technique, yoke technique
- frequency of calibration
- preliminary examinations
- method of examination
- excess particle removal
- interpretation
- demagnetization
- evaluation, recording of indications
- examination records
Visual Examination - Article 9
- written procedure requirements
- physical requirements
- equipment
- direct visual examination
- remote visual examination
- evaluation
- report of examination
Leak Testing - Article 10
- written procedure requirements for any metal, nonmetal, welded component
- gages
- temperature requirements
- pressure/vacuum requirements (pressure limits)
- pressure/vacuum gage calibration
- calibration leak standards
- test reports
Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method - Article 23, SE-797
- significance and use
- basis of application
- apparatus
- technical hazards
e-Instructor Support
CASTI e-Instructor provides support for any questions about the online course content.
Learning Self-Assessment
Practice problems throughout the course content are graded to allow self-assessment of student learning. Grades are reported at the completion of each lesson within the online content. Answer keys include references to the corresponding sections of ASME Section V.
Required Code Documents
The ASME Section V document is required to complete this course. If you require a copy, it can be purchased from CASTI when you register for the course.
Continuing Professional Development (CPD) Hours
Participants will receive a digital CASTI Certificate of Completion, awarding 15 CPD hours, for successfully completing all online lessons. Note: CPD (Continuing Professional Development) hours are equivalent to PDH (Professional Development Hours).
Minimum System Requirements for Online Training with e-Instructor Support
Getting Started: Online Training Course with e-Instructor Support
- Broadband Internet connection
- Windows Vista (or higher)
- Mac and Android computers and tablets are not supported
- Google Chrome. (Microsoft Edge NOT supported.)
- Latest version of Adobe Reader
Note: Use of Adobe software may have additional system requirements (Please refer to the Adobe specifications provided with your Adobe software or visit the Adobe website at www.adobe.com for more information.)
Note: Please consult with your company IT department if you are unsure that your company computer meets the above requirements
Related Courses
- Inspection Practices for Pressure Vessels Using API RP 572
- Inspection Practices for Piping System Components Using API RP 574
- Inspection of Pressure-Relieving Devices Using API RP 576
- Introduction to Welding Processes, Inspection, and Metallurgy Using API RP 577
- Introduction to Pipe Flanges and Flanged Fittings Using ASME B16.5